2025
Charcoal & Cedar Two-Storey
Terwillegar, Edmonton
Full re-clad, cedar entry feature, aluminum soffit
James Hardie HardiePlank · Western red cedar · Black metal trim
10+ years finishing exteriors across Edmonton & area · Fully insured & WCB covered
(780) 901-8483
Edmonton, Alberta
Based in Terwillegar — 20 minutes to most Edmonton addresses
We are based on Terwillegar Drive, which means most Edmonton addresses are a twenty-minute drive from our shop. That matters more than it sounds: it is why we can get to a site the morning after a wind event, and why our crews are not burning an hour of your project each way.
Edmonton's freeze-thaw cycle is the harshest test an exterior wall in Canada faces. We detail every wall assuming water will get behind the cladding at some point — because eventually it does.
Mature neighbourhoods like Glenora, Crestwood and Parkallen frequently hide 1950s sheathing with no water-resistive barrier at all. We budget inspection time into every re-clad quote in these areas rather than surprising you with a change order.
New southwest and southeast communities are dominated by tall, narrow elevations with complex rooflines. Those need scaffold and staged sequencing — not two ladders and optimism.
City of Edmonton development permits are not usually required for like-for-like siding replacement, but heritage-designated and mature-area overlay properties can differ. We flag it during the measure.
Neighbourhoods we work in
“They pulled the old siding off, found rot under two windows we had no idea about, photographed it, priced the repair the same day and carried on. No drama, no padding.”
Local work

2025
Terwillegar, Edmonton
Full re-clad, cedar entry feature, aluminum soffit
James Hardie HardiePlank · Western red cedar · Black metal trim

2025
Windermere, Edmonton
New-build cladding for a custom builder
HardiePlank Select Cedarmill · Black aluminum fascia

2024
Erin Ridge, St. Albert
Vinyl removal, full board-and-batten re-clad
HardiePanel & HardieTrim · Arctic White
Before & after

Before
After
Beaumont, AB
Eleven days on site. Rotten sheathing at two window heads was replaced before any new cladding went up.

During
After
Spruce Grove, AB
New water-resistive barrier, taped penetrations and a vented rainscreen behind every board.
Edmonton questions
Request an estimate — Edmonton
A 45-minute on-site measure, then a fixed written price with the scope itemised. No pressure, no sales visit, no obligation.